CLOVERPARK TECHNICAL COLLEGE

This project is for the design of the new Cloverpark Technical College Building.  The design competition took place between September and December of 2016.  The challenges or program and equipment are balanced to create an open layout between each shop.  

 

Team

Tim Richey, Barney Mansavage, Stephen Kear, Arnulfo Ramirez, Marshall Turner

Responsibilities

  • Collaborate with team to explore design options.
  • Maintain Revit Design Options.
  • Create Room Area Schedules.
  • Create self updating Gross Square Footage Sheets.
  • Provide Solutions to Programmatic Parameters.
  • Create Revit Families to optimize design changes.
  • Create Revit Schedules.

Information

Location                                               4500 Steilacoom Blvd SW       Lakewood, WA 98499

Firm
SRG Archtiects

 

 

Gallery