Ferrucci Junior High needed a 10 classroom addition and a commons expansion to accommodate its growing student population.  Our design studies explored various locations in response to the schools property layout and finalized on adding our classrooms to the eastern section of the property  to create a visible presence for the upcoming traffic of Wildwood Park Drive.

Our design concept was initivated by a vision to created an angled classroom wing that broke the rigid nature of the existing brick building.  I found that a 10 degree angle provided sufficient space to connect the Classrooms to the Gym area.  This angle tore away from the structured layout of the existing brick building and improved circulation to the classrooms.

Our connection to the existing main building proved challenging and required detailed BIM coordination. I managed the consultant coordination meetings and produced bi-weekly reports on coordination items based on my Navisworks clash-detection reports.  My role in this project evolved from designer to revit model manager, to project architect / code reviewer, and finally construction administrator.  

BUILDING TYPE: NEW ADDITION (VB) EXISTING BUILDING (IIB)

 

Team

  • Kevin Flanagan (Principal in Charge)

  • Ben Hill  (Principal Project Manager)

  • Brian Love (Principal Design)

  • Arnulfo Ramirez (Project Architect/ Model Manager)

  • Jessica Tse (Architectural Designer)

  • Erin Fantozz (Interior Designer)

  • Lauren Jane Peterson (Interior Graphics)

  • David Schaffer (Building Technology Consultant)

Responsibilities

  • Part of 3 Week Design Charette to develop classroom and commons addition design  

  • Produce Revit 3D programmatic model for design studies 

  • Produce site plan model with civil topography to create mass studies

  • Produce revit model of existing school from as-builts

  • Setup Existing/Demo/Construction/New Construction 3D model phases

  • Lead the revit model development from SD through CD

  • Train new team members on model organization

  • Update and track weekly reports of team member tasks 

  • Produce model development reports for project manager

  • Organize consultant meetings and coordinate 3d models

  • Create Navisworks clash detection reports of Structural/Mechanical/Architectural revit models

  • Run model coordination meetings with structural, mechanical and electrical engineers

  • Develop approach for Code sheets and interpretation of code review

  • Responsible for Code Review and Code studies

  • Responsible for Room Occupancy plans 

  • Assess Existing building and provide plan to incorporate exit egress paths

  • Create  an Office Code Review guide for future Level 3 design staff

  • Develop Temporary Egress plans for construction phases

  • Produce color coded Visibility Graphics to study coordination models

  • Establish communication line with City Building Inspector and Fire Marshall

  • Train level 1 Staff on exterior envelope detailing and revit standards

  • Point of contact for architectural exterior envelope questions during construction

 

PHOTOGRAPHS AND PERSPECTIVES

 
 
 

3D DIAGRAMS AND PLANS


 

CLASSROOM ADDITION

CLASSROOM MECHANICAL SYSTEM CLASSROOM HALLWAY CONNECTION

 

COMMONS ADDITION


NAVISWORKS - CLASH DETECTION STUDY

 

CODE SHEETS

 

EXTERIOR DETAILS

 

EXTERIOR ENVELOPE